by ihaz design | Jul 13, 2013 | Community news
Just a quick update on the NW LRT construction, post flood. In spite of the flood and its aftermath, crews received permission to proceed with the installation of the pedestrian bridges on June 26 and 27. The installation of the bridges enables the project to stay on...
by ihaz design | Jun 28, 2013 | President Message
I really did not anticipate I would be writing this last message. It is with mixed emotions that I am resigning as president of the Rocky Ridge Royal Oak Community Association. It’s was a very difficult decision to make; we have such a great team on the board....
by ihaz design | Jun 28, 2013 | Blog, Community news
Ward Sutherland has just announced that he is stepping down from his role as President of the Community Association in order to run for Councillor of Ward One. The Board of Directors are sorry to see him go as Ward was such a valuable contributing member to not only...
by ihaz design | Jun 17, 2013 | Community news, Transportation
Pedestrian bridge installation – NW LRT extension to Rocky Ridge/Tuscany June 13, 2013 Installation of the north and south pedestrian bridges connecting the Tuscany Station to the future Park and Ride lots is scheduled for Wed., June 26 and Thurs., June 27....