Rocky Ridge Lake Phase 4 Update by ihaz design | Apr 4, 2013 | Planning and Development Tree removal will begin through out the area and installation of the silt fence around the wetlands and specific areas to control erosion issues. General stripping and grading will begin weather permitting. Ward Sutherland- Planning