Pedestrian bridge installation – NW LRT extension to Rocky Ridge/Tuscany

June 13, 2013

Installation of the north and south pedestrian bridges connecting the Tuscany Station to the future Park and Ride lots is scheduled for Wed., June 26 and Thurs., June 27. Crowchild Trail will be closed on one side only on each night.

  • To install the south pedestrian bridge, Crowchild Trail travelling east will be closed from 12 Mile Coulee Road to Stoney Trail from 8 p.m. to 5 a.m. on June 26.
  • To install the north pedestrian bridge, Crowchild Trail travelling west will be closed from Stoney Trail to 12 Mile Coulee Road from 10 p.m. to 5 a.m. on June 27.
  • Please see maps for detour details during each closure.

*Weather and/or site conditions may affect the bridge installation. If the bridge installation cannot proceed, it will be done the next night.
road1
Please see back for detour map for Thurs., June 27
road2
Please visit www.calgary.ca/nwlrt for more information about this project or call 311.